Looks safe to me
#1
Senior Member
Thread Starter

I had the electric company install service on the new pole barn. I guess they are waiting for the crew to install the meter. It has been a couple days now.


#3
Senior Member

Perfectly normal...stick your finger in it
#6

Standard practice. One of my buildings was jumped for 5 months waiting for a meter install
#7
Admirals Club 

#9
Senior Member



Join Date: Jan 2005
Location: Suburb of Sugar Tit SC
Posts: 14,346
Received 9,223 Likes
on
4,980 Posts

Jumper cables and fire the thing up.
got to my uncles old lake place years ago one Friday afternoon (early 90’s), and the meter was pulled for non-payment. It was a single wide in a group of three with meters all in a bank. Neighbor had failed to lay their bill, and the wrong meter got pulled. Power company refused to send anyone out until Monday despite it being their fault. Out came the gloves and the jumper cables and we had a great weekend. Power company wrote a decent size check for all the spoiled food after preaching about how dangerous doing such was.
got to my uncles old lake place years ago one Friday afternoon (early 90’s), and the meter was pulled for non-payment. It was a single wide in a group of three with meters all in a bank. Neighbor had failed to lay their bill, and the wrong meter got pulled. Power company refused to send anyone out until Monday despite it being their fault. Out came the gloves and the jumper cables and we had a great weekend. Power company wrote a decent size check for all the spoiled food after preaching about how dangerous doing such was.
#11
Senior Member
#12

[QUOTE=autobaun70;14037372]Jumper cables and fire the thing up.
got to my uncles old lake place years ago one Friday afternoon (early 90’s), and the meter was pulled for non-payment. It was a single wide in a group of three with meters all in a bank. Neighbor had failed to lay their bill, and the wrong meter got pulled. Power company refused to send anyone out until Monday despite it being their fault. Out came the gloves and the jumper cables and we had a great weekend. Power company wrote a decent size check for all the spoiled food after preaching about how dangerous doing such was.[/QUOTE)
Friend flattened some copper tubing and put it in after his meter got pulled for non payment .
The power company removed them and left a do not touch note , he then used a set of jumper cables for a week. Power company came back out , sheriff came out , he went to jail for it.
got to my uncles old lake place years ago one Friday afternoon (early 90’s), and the meter was pulled for non-payment. It was a single wide in a group of three with meters all in a bank. Neighbor had failed to lay their bill, and the wrong meter got pulled. Power company refused to send anyone out until Monday despite it being their fault. Out came the gloves and the jumper cables and we had a great weekend. Power company wrote a decent size check for all the spoiled food after preaching about how dangerous doing such was.[/QUOTE)
Friend flattened some copper tubing and put it in after his meter got pulled for non payment .
The power company removed them and left a do not touch note , he then used a set of jumper cables for a week. Power company came back out , sheriff came out , he went to jail for it.
#14
Senior Member
Thread Starter
#18
Senior Member
Thread Starter
#19
Senior Member




[QUOTE=drowning shrimp;14037444]
We replaced water lines in a MHP recently where several of the meter slots had dinner knives placed in them.
Jumper cables and fire the thing up.
got to my uncles old lake place years ago one Friday afternoon (early 90’s), and the meter was pulled for non-payment. It was a single wide in a group of three with meters all in a bank. Neighbor had failed to lay their bill, and the wrong meter got pulled. Power company refused to send anyone out until Monday despite it being their fault. Out came the gloves and the jumper cables and we had a great weekend. Power company wrote a decent size check for all the spoiled food after preaching about how dangerous doing such was.[/QUOTE)
Friend flattened some copper tubing and put it in after his meter got pulled for non payment .
The power company removed them and left a do not touch note , he then used a set of jumper cables for a week. Power company came back out , sheriff came out , he went to jail for it.
got to my uncles old lake place years ago one Friday afternoon (early 90’s), and the meter was pulled for non-payment. It was a single wide in a group of three with meters all in a bank. Neighbor had failed to lay their bill, and the wrong meter got pulled. Power company refused to send anyone out until Monday despite it being their fault. Out came the gloves and the jumper cables and we had a great weekend. Power company wrote a decent size check for all the spoiled food after preaching about how dangerous doing such was.[/QUOTE)
Friend flattened some copper tubing and put it in after his meter got pulled for non payment .
The power company removed them and left a do not touch note , he then used a set of jumper cables for a week. Power company came back out , sheriff came out , he went to jail for it.