I watch a lot of these custom builds, that go on for many months, and I am always amazed at the time it takes. Let me say, that I am envious of every one of them, so this is not a slam, and I didn't want to ask it on anyone's particular build. But by comparison, how how long does it take to build a production boat, that has options choices, but not so much one off customization. Say a Tiara 43LS.
https://www.tiarasport.com/43-ls/

It would be nice to be able to mount the sort of enterprise in the 2 examples below, but in the medical fields, to get us out of our current situation.

San Francisco Bay Area shipbuilders produced almost 45 percent of all the cargo shipping tonnage and 20 percent of warship tonnage built in the entire country during World War II. The war lasted 1,365 days. In that span of time Bay Area shipyards built 1,400 vessels--a ship a day, on average.

The Empire State Building took only one year and 45 days to build, or more than seven million man-hours.
Old 03-27-2020, 12:34 AM
  #2  
Admirals Club Admiral's Club Member
 
Join Date: Mar 2004
Posts: 1,856
Received 186 Likes on 100 Posts
Default

Are you referring to guys building/rebuilding their own boats, or a for profit company custom vs production builder?
Old 03-27-2020, 02:29 AM
  #3  
Senior Member
 
Join Date: Aug 2012
Posts: 7,635
Received 864 Likes on 488 Posts
Default

Bear in mind there's a difference between length of time to build and man hours spent on a boat.
Old 03-27-2020, 06:40 AM
  #4  
Admirals ClubCaptains Club Member Admiral's Club Member
 
Join Date: Jun 2005
Location: Monroe, MI
Posts: 643
Received 131 Likes on 60 Posts
Default

Somethings can be accelerated, some cant. "You cant put nine women in a room and have a baby in a month". That said, yes, with enough manpower, some of these builds for sure could be accelerated. However, the availability of craftsman today, vs that of the 1940's is vastly different. The US was an industrial economy, we made things. Now we code things, and make a little bit of stuff (as a relative % of GDP).
Old 03-27-2020, 06:46 AM
  #5  
Admirals Club Admiral's Club Member
 
Join Date: Apr 2009
Posts: 1,194
Received 154 Likes on 98 Posts
Default

The amount oh hours it takes to build z custom sport fish is staggering. Bayliss used to list on their website the amount of hours it took to build a boat. I believe when they built the 90' Singularis it took something like 90,000 man hours to build.

Also, there is a business side to boat building. How big do you want to build a business on consumer discretionary spending? How much debt to you want to incur to ramp up production for a level of demand that could be gone tomorrow. Current situation case in point.
Old 03-27-2020, 07:13 AM
  #6  
Junior Member
 
Join Date: Dec 2011
Posts: 10
Likes: 0
Received 0 Likes on 0 Posts
Default

The Liberty Ships were designed expressly so they could be cranked out at that accelerated pace. As such, the initial results were not good. Furthermore, the ships were not built to last. There is a great difference in the quality that today's consumer demands and that of a large mainly square bulk tanker of 80 years ago. We might not make them like we used to, and thank goodness for that.

"The failure of many of the World War II Liberty ships is a well-known and dramatic example of the brittle fracture of steel that was thought to be ductile. Some of the early ships experienced structural damage when cracks developed in their decks and hulls. Three of them catastrophically split in half when cracks formed, grew to critical lengths, and then rapidly propagated completely around the ships’ girths."

Old 03-27-2020, 07:22 AM
  #7  
Senior MemberCaptains Club Member
 
Join Date: Oct 2004
Location: Ocean City, NJ
Posts: 2,101
Received 307 Likes on 175 Posts
Default

Viking employs about 1000 workers (+/-) when times are good. Does Bayliss have 100 employees? Don't know. I know Jersey Cape employs less than 100. A build at that shop takes about 12-18 months. All about manpower, and whether you want the headache. As a business owner myself, I prefer the Bayliss model. We do just fine and I never have had to lay off an employee in over 30 years. Even in these times.
Likes:
Old 03-27-2020, 07:36 AM
  #8  
Senior Member
 
Join Date: Jan 2019
Location: Silverton, Oregon
Posts: 325
Received 327 Likes on 156 Posts
Default

Our boat was just a regular build based on off-the-shelf options (Scout 215 XSF) and it took about two months to build - not surprising that it would take over a year to build a custom boat at a small shop.
Old 03-27-2020, 07:45 AM
  #9  
Admirals Club Admiral's Club Member
 
Join Date: Apr 2009
Posts: 1,194
Received 154 Likes on 98 Posts
Default

Look at Freeman. They have a multi year wait list to build a boat. People were talking 3 to 4 years before you hit a mold. Is there wait list going top shrink through this, most likely, but I bet they don't slow down on the number of boats actually built during the year. Had they ramped up production, gotten bigger buildings, more equipment, more employees and were down to a short a wait list they would be losing production. With a multi year wait list they probably keep building boats and never skip a beat and by the time this is over and the economy is better that wait list will be back out to where it is. High volume on demand and stocking builders will take a hit and most likely have layoffs and other disruptions.
Old 03-27-2020, 07:57 AM
  #10  
Senior MemberCaptains Club Member
THT sponsor
 
Schmaltz~Herring's Avatar
 
Join Date: May 2002
Location: Cruising Lake Titikacka On My 18' Bayliner Element With 60 HP Optimax's
Posts: 17,596
Received 1,027 Likes on 510 Posts
Default

Whaler can knock most boats out in 3-5 days, chopper gun, foam inject, attach hardware, voila it's done.
Old 03-27-2020, 08:20 AM
  #11  
Senior MemberCaptains Club Member
Thread Starter
 
Join Date: Feb 2003
Location: Chapel Hill and PKS, North Carolina
Posts: 6,952
Received 281 Likes on 171 Posts
Default

Originally Posted by Dan_F View Post
Our boat was just a regular build based on off-the-shelf options (Scout 215 XSF) and it took about two months to build - not surprising that it would take over a year to build a custom boat at a small shop.
Was that actual production time, or order to delivery time?
Old 03-27-2020, 09:21 AM
  #12  
Senior MemberCaptains Club Member
 
Join Date: Aug 2007
Location: Long Beach, Indiana
Posts: 2,121
Received 116 Likes on 65 Posts
Default

It took me a little over 2 years to build our 25' Tolman Jumbo. Another builder did one in 90 days.


Old 03-27-2020, 10:08 AM
  #13  
Senior Member
 
Join Date: Jan 2019
Location: Silverton, Oregon
Posts: 325
Received 327 Likes on 156 Posts
Default

Originally Posted by glacierbaze View Post
Was that actual production time, or order to delivery time?
From start of build to delivery, we ordered it a couple months prior to the build starting.
Old 03-27-2020, 11:12 AM
  #14  
Senior Member
 
Join Date: Jun 2014
Location: St. Augustine
Posts: 105
Likes: 0
Received 50 Likes on 32 Posts
Default

When it was in full operation, DESCO in St. Augustine was putting out sRhino boat every couple of days off the assembly line.

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are Off


Thread Tools
Search this Thread

Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service - Do Not Sell My Personal Information

Copyright © 2018 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.