View Single Post
Old 10-18-2016, 04:06 AM
  #4  
jkmjr
Senior Member
 
Join Date: Mar 2013
Posts: 919
Default

As stated earlier we cant get the material to the resting spot because of a very steep hill so we took the frames to a make shift boat launch to assemble. Once assembled we will move it across the lake with a boat.

Name:  3D4F0BD1-1D66-460B-878D-759E8EA6182F_zpssxfzvxlt.jpg
Views: 63
Size:  284.2 KB

Once there we installed the joists and floats.

Name:  B9E96F25-A236-4BF4-9C1E-532C412F1140_zpsacgvy82j.jpg
Views: 66
Size:  295.7 KB

Name:  0AB7DF46-243A-4C1D-8931-0AC3AAB93ADF_zpsh7bpp4ku.jpg
Views: 129
Size:  254.9 KB

I used 52 2x4x18" floats for this dock. I has enough buoyancy for a cover to be added later.
Name:  0D6404FD-6896-42DB-9AF5-37E8688F9F13_zpskpzetfwj.jpg
Views: 62
Size:  388.5 KB
jkmjr is offline