Old 03-12-2012, 09:29 PM
  #105  
28memco
Admirals Club Admiral's Club Member
 
Join Date: Mar 2012
Location: In my backyard working on my boat
Posts: 2,164
Received 422 Likes on 235 Posts
Default Restoration started in the cabin

Name:  IMAG0034.jpg
Views: 5330
Size:  94.5 KB

Name:  IMAG0035.jpg
Views: 5263
Size:  94.3 KB

Name:  IMAG0036.jpg
Views: 5291
Size:  95.8 KB

Name:  IMAG0037.jpg
Views: 5318
Size:  93.9 KB

Name:  IMAG0038.jpg
Views: 5254
Size:  87.5 KB

Name:  IMAG0039.jpg
Views: 5286
Size:  84.6 KB

Name:  IMAG0040.jpg
Views: 5190
Size:  93.2 KB

Name:  IMAG0041.jpg
Views: 5185
Size:  97.6 KB

Name:  IMAG0049.jpg
Views: 5258
Size:  90.5 KB

1st day of the project started in the cabin. There are no structural issues with this boat just cosmetic. Inside the cabin the paint is piling and there is a little mildew so there's a lot of sanding to do. I have the boat broken down into about 6 sections in the order I plain on starting on and finishing with. I also shop vac ALL and I say ALL the water out of the bilges. I HATE when a bilge have water in it. I was going to start at the top and work down (flybridge) but my epoxy resin want be in until tomorrow so that's why I made the decision to start inside the cabin. The only thing that will be done inside the cabin is painting (have not decided the colors), changing the dome light to LED, installing a flat screen tv, and I'm going to do teak floors. I think the teak floors will make the cabin pop (POP <--- I've been watching to much HGTV). After the cabin is done I will be starting on the flybridge. Once I get to the flybridge I will let you no then what my plains are for the flybridge. Stay toon